BS EN 1634-1 tested · Third-party certified · UK-wide
Certified fire doorsets, proven — not promised.
From 2026 we supply and install third-party-certified timber fire doorsets — FD30 to FD120 — for social housing, healthcare, education and commercial buildings across the UK. Every doorset will arrive with its complete evidence trail: certification, installation records and golden-thread documentation.
- FD30–FD120
- Full certified range, timber & glazed
- 100%
- Third-party certified — our non-negotiable supply rule
- 3 mm
- Gap tolerance specified — and checked — on every install
- Reg 38
- Handover pack with every project
Product range
Four ratings. One standard of evidence.
Every doorset is manufactured under third-party certification, labelled with a traceable plug, and delivered with its test evidence. No re-badged leaves, no substituted components.
30minutes
- 44 mm certified core
- Flat entrance & corridor doorsets
- PAS 24 security combination available
- Smoke-sealed (s) variants
60minutes
- 54 mm certified core
- Protected shafts & risers
- Acoustic variants available
- Glazed vision panels, tested
90minutes
- Heavy-duty certified core
- Plant rooms & service cores
- High-traffic ironmongery packages
- Overpanel & screen assemblies
120minutes
- Maximum-duration assemblies
- Compartment walls & basements
- Specialist frame & seal systems
- Project-specific test evidence
The Compliance Hub
Regulation moves. We keep you ahead of it.
Plain-English guidance on the duties that follow the Building Safety Act 2022 — reviewed against the source legislation, with every source cited.
Fire Door Checks Under Regulation 10: How Often, What to Check and Who Is Responsible
Regulation 10 requires quarterly checks of communal fire doors and annual flat entrance door checks in English residential buildings over 11m. Full guide.
Read the guidance →Regulation 38 Fire Safety Information: The Handover Duty Explained
Regulation 38 of the Building Regulations 2010: who must hand fire safety information to the responsible person, when, and what a fire door pack contains.
Read the guidance →BS 476 vs EN 1634: UK Fire Door Testing Standards Explained
BS 476-22 vs BS EN 1634-1 fire door testing compared: E, EI and EW classes, the FD30-to-E30 mapping table, and the 2029 Approved Document B change.
Read the guidance →Fire Door Compliance Checker
Answer a few questions about your building and role. Get your legal duties — checking intervals, record-keeping, responsible persons — in plain English, with the regulation cited for each.
Sectors
Specified where failure is not an option.
Social housing
Flat entrance doorset replacement programmes with tenant liaison and full golden-thread records.
Reg 10 + FD30sHealthcare
Acoustic-rated doorsets for wards and treatment rooms, scheduled around live clinical environments.
HTM 05-02Education
High-traffic corridor and classroom doorsets engineered for abuse resistance and holiday installation windows.
BB 100Commercial
Doorset packages for offices and mixed-use schemes, coordinated with main-contractor programmes.
BS 9999Heritage & listed
Fire performance upgrades that conservation officers approve — tested detail by tested detail.
Listed consentHow we work
From survey to signed evidence, one accountable team.
When we open in 2026, the same team will supply, install, survey and maintain your fire doors. See all services →
Survey
Laser survey of every structural opening. Discrepancies resolved before manufacture, not on site.
Manufacture
Certified components under factory production control. No substitutions — the certificate travels with the leaf.
Install
Third-party-certificated installation. Gap tolerances checked and photographed on every edge.
Certify & hand over
Regulation 38 pack, plug identification per leaf, and the golden-thread record in your chosen format.
Maintain
Planned inspection contracts aligned to your statutory checking intervals, with photographic reporting.
The evidence pack
Every doorset ships with its evidence.
A fire door without documentation is just a door. Under the Building Safety Act, the record is part of the product — so we treat the paperwork with the same rigour as the joinery. This is what will arrive with every project, before the final invoice does.
EN 1634-1Test evidence summaryPrimary test reports and field-of-application assessments for every doorset configuration supplied.REG 38Fire safety information packHandover documentation formatted for building control sign-off and the responsible person's records.INSTALLInstallation certificatesPer-doorset certificates from third-party-certificated installers, with photographic gap and fixing records.O&MOperation & maintenance manualInspection intervals, permitted adjustments, and the component schedule for future maintenance.GT-CSVGolden-thread digital recordStructured asset data — location, rating, plug ID, install date — in CSV or COBie for your CAFM system.While we prepare for launch
Start with your compliance position.
Our supply and installation service opens soon. The Compliance Hub, checker and technical references are open now — use them to understand exactly what the law requires of your buildings.
Contact us →